Project:

Sytner Mercedes Benz, Bedford

We installed heaTRAY throughout the workshop to enable their workers to keep working in adverse weather.

Client:
Mercedes Benz
Location:
Bedford
Completion Date:
March 2022
Product Category:
Body Shops, Industrial

Project Brief:

interRAY were approached by Kevin Davies of First Facilities Management as the Sytner Mercedes Benz workshop in Bedford had no heating due to the unavailability of parts for their Gas Space heaters.

interRAY were able to quote and provide an immediate installation date. There was a little bit of doubt as this type of heating was unknown to anybody on-site. A visit was arranged to view an existing installation.

The heaTRAY system was ordered within hours of the demonstration.

Project Solution:

7 3.9kW heaTRAY heaters installed in the work shop and 1 in the parts area all operated with a 7 day timed thermostat Dynamic Drive controller fed with a 32A 3 Phase feed. A 450w single phase heaTRAY heater operated via an on/off break timer only 2M high above the parts personnel desks.

The dealership was approached by Sytner Mercedes Benz in Weston Super Mare for their opinion which can be seen in our Testimonials.